Key Technical Takeaways & Execution Rules

  • Configure Sectorial Scans (S-scan) from 40° to 70° with 0.5° angular resolution for full volume weld coverage.
  • Perform Time Corrected Gain (TCG) calibration using IIW Block V1/V2 and side-drilled holes (SDH) at 3 depth targets.
  • Encoder calibration tolerance must be kept within ±1% over a 500mm scanning distance.
  • Set amplitude threshold at 20% DAC/TCG for indication recording and 50% DAC for evaluation.

Step-by-Step Field Execution Procedure

1

Probe & Wedge Verification

Inspect probe element array (e.g. 5 MHz 32-element array) for dead elements using pulse-echo check. Verify wedge angle (e.g. 55° shear wave wedge) and measure wedge delay.

2

Velocity & Wedge Delay Calibration

Couple wedge to IIW Block V1 radius (100mm). Calibrate material velocity (5920 m/s for carbon steel longitudinal, 3240 m/s for shear) and adjust wedge delay across all focal laws.

3

Sensitivity & TCG Curve Construction

Scan calibration block containing 1.5mm SDHs at T/4, T/2, and 3T/4 depths. Normalize peak amplitudes to 80% Full Screen Height (FSH) to generate a smooth 3-point TCG curve.

4

Weld Overlay & Scan Plan Setup

Input weld bevel geometry (V-bevel, J-bevel, thickness) into instrument beam simulation. Verify complete coverage of weld root, toes, fusion line, and cap.

5

Data Acquisition & Defect Characterization

Perform automated or semi-automated raster scan. Evaluate A-scan, B-scan, C-scan, and S-scan views to characterize volumetric defects (porosity, slag) versus planar defects (lack of fusion, cracks).

Probe & Wedge Selection Specs

  • 5L32-A11
  • 2.25L32-A12
  • 7.5L64-A10

Code Acceptance Criteria

ASME Sec V Art 4 Mandatory Appendix VIII / ASME B31.3 Table 341.3.2: Cracks, lack of fusion, and incomplete penetration are strictly rejectable regardless of length. Volumetric indications exceeding 50% TCG evaluated against max length limits.