Data Retention & Trash Vault Storage Policy
How NDT Exchange safeguards mission-critical plant CAD models, tubesheet matrices, ultrasonic scan plans, and certified inspection reports. Governing statutory retention rules, Trash Vault soft-delete lifecycles, and strict purge prevention controls.
1. Soft-Delete by Default
2. Project-Bound Lock
jobId) is permanently blocked from hard deletion by anyone.3. 10-Year Audit Integrity
01.The Trash Vault Lifecycle (Soft-Delete Standard)
To prevent accidental destruction of proprietary asset geometries, tubesheet coordinates, and pipeline scan plans during plant turnarounds or engineering design sessions, NDT Exchange enforces a zero-instant-hard-delete rule for all engineering entities:
- Trash Vault Archival: When an asset owner or engineer clicks "Delete", the record is not dropped from the database. Instead, it is cryptographically signed and transferred into the organization's isolated
Trash Vault(located at/dashboard/trash). - Self-Serve Instant Recovery: Any authenticated team member belonging to the owning organization can view trashed models and restore them back to the active workspace with one click.
- Admin-Only Purge Access: Regular inspectors and project contributors have zero ability to execute a permanent purge. Permanent removal is guarded strictly for authorized Organization Administrators and Platform Superadmins.
02.Strict Purge Prevention Guards (When Hard Delete is Forbidden)
Under American Society of Mechanical Engineers (ASME), American Petroleum Institute (API), and international quality audit guidelines, certain records form the legal chain of custody for pressure boundaries and structural safety.
NDT Exchange enforces programmatic guards that permanently forbid hard deletion (purge)—even for Platform Superadmins—under the following circumstances:
×1. Assets Attached to Turnkey Projects or RFPs (Job Lock)
If an asset CAD geometry (TEMA Tubesheet, API 650 Tank Shell, Pressure Vessel, or Piping Spool) is referenced by an active or historical inspection project (jobId), purge is permanently blocked. The system will display an immutable compliance lock: Bound to Project #JOB_ID.
×2. Certified Inspection Reports & Level III Sign-Offs
Certified deliverables stamped by certified Level II / Level III personnel cannot be purged. If revisions or corrections are required, inspectors must issue a signed revision addendum (Rev 1, Rev 2), preserving the historical original for forensic safety reviews.
×3. Equipment Fleets with ISO 17025 Calibration Records
Non-destructive testing hardware (ultrasonic flaw detectors, gamma crawlers, eddy current array probes) cited in field inspection tasks must retain their serial calibration history. Purging an instrument invalidates all downstream reports referencing that equipment serial. Decommissioned units may only be marked as Retired.
×4. Platform Subscriptions, Billing & Tax Ledger Transactions
SaaS subscription charges, add-on invoices, and platform accounting ledgers are subject to statutory 7-to-10-year international commercial tax retention. Ledger documents can be marked as Voided or Refunded, but database rows cannot be purged.
×5. Cascade Integrity Guard for Parent Entities
A company, academy, or manufacturer cannot be purged while dependent child records (active inspection projects, enrolled students, registered fleet items, or pending work orders) exist. All dependent relationships must be formally concluded or decoupled before archival.
03.Decoupling Personal Data vs. Industrial Engineering Custody
Under global privacy legislation—including the European General Data Protection Regulation (GDPR), the UK GDPR, India's Digital Personal Data Protection Act (DPDPA), Singapore's PDPA, and the California Consumer Privacy Act (CCPA/CPRA)—individuals maintain statutory rights to request erasure of their personal identity (the Right to be Forgotten).
How NDT Exchange Reconciles Privacy Rights with Plant Safety Laws:
When an individual inspector, technician, or user requests full personal erasure, their personal identity (contact details, phone, email, credentials profile, login accounts) is permanently erased and anonymized. However, the physical inspection thickness measurements, flaw coordinates, and asset CAD models recorded during an inspection are classified as Permanent Engineering Asset Custody Records and remain preserved for plant safety compliance without containing identifiable personal information.
🔒 Signed-In Verification & Formal Protocol: To prevent fraudulent deletion attacks against certified inspectors, erasure requests can only be initiated by authenticated, signed-up users from Dashboard Support under "Right to be Forgotten". A request does not take effect on its own. Our Data Protection Officer (DPO) will initiate formal email communications to verify identity, audit active contractual liabilities, and review statutory tax retention before any account decoupling is processed.
04.Batch "Empty Trash Vault" Integrity Routine
When an Organization Administrator executes the "Empty Trash Vault" batch maintenance action, the engine executes a deterministic safety filter:
- Unlinked drafts, temporary experiments, and orphaned models without project references are permanently erased.
- Any asset document attached to an active or completed inspection job (
jobId) is automatically preserved in the Trash Vault. - The administrator is provided with an explicit audit count of purged records versus preserved compliance assets.
05.Compliance & Legal Inquiries
For regulatory audits, forensic data access requests, or custom long-term archival schedules (e.g. 20-year nuclear plant life extension records), plant asset managers and corporate legal counsel can reach our compliance team:
Email: compliance@ndtexchange.com
Legal Custody: Seyon Nexa Labs / Nvision Systems Legal Counsel
Jurisdiction: Global Engineering Asset Cloud (SOC 2 Type II, ISO 27001 Certified Host)