13 min read•ASME Boiler and Pressure Vessel Code Section V Article 8 / TEMA 10th Edition RCB
ECT / RFT / IRIS • Electromagnetic & TubingTarget: Tubing Inspection Specialists, Heat Exchanger Reliability Engineers, Turnaround QC

Heat Exchanger Tubing Eddy Current (ECT/RFT/IRIS) Guide

Field Procedure for ASME Section V Article 8 & TEMA RCB Defect Sizing

Applicable Standards:ASME Sec V Art 8TEMA 10th Ed RCBASTM E243API 572

Key Technical Takeaways & Execution Rules

  • Set bobbin probe test frequencies so differential signal phase angle for 100% through-wall through-hole is set between 40° and 50° (standard 4-channel setup).
  • Calibrate depth curves using ASME Section V Article 8 calibration standard with 20%, 40%, 60%, 80% OD flat-bottom holes (FBH) and 20% ID circumferential groove.
  • For carbon steel and ferromagnetic tubing, transition from standard ECT to Remote Field Testing (RFT) or Internal Rotary Inspection System (IRIS) ultrasonic probes.
  • TEMA Section 5 RCB requires mandatory tube plugging when remaining wall thickness drops below the calculated minimum pressure threshold (typically >=60% wall loss).

Step-by-Step Field Execution Procedure

1

Bobbin Probe & Fill-Factor Verification

Select differential/absolute bobbin probe with a fill-factor between 0.80 and 0.85 (probe OD = 0.8 to 0.85 * tube nominal ID) to ensure maximum sensitivity without binding on tube scale.

2

ASME Reference Standard Calibration & Phase Freeze

Pull probe through ASME Section V Article 8 calibration tube. Adjust phase angle so horizontal movement represents probe wobble. Lock through-hole signal at 40° in quadrant 1.

3

Phase-to-Depth Calibration Curve Generation

Record signal amplitudes and phase rotations from 20%, 40%, 60%, and 80% OD flat bottom holes. Generate phase angle vs. depth calibration curve inside the data acquisition software.

4

High-Speed Automated Bundle Raster Acquisition

Execute automated tube pulling using a pneumatic pusher-puller at 1.0 to 1.5 m/s. Flag tube sheet rollovers, baffle support wear plates, and free-span pitting.

5

Tubesheet CAD Mapping & Plugging Determination

Import inspection matrix directly into TEMA Tube Designer CAD. Map percent wall loss, identify clusters of tubes requiring tapered ASME plugs, and export client tubesheet map.

Governing Physical & Code Formulas

Standard Depth of Penetration (Eddy Current Skin Depth)

Code Formula
δ=1π⋅f⋅μ⋅σ=503⋅ρf⋅μr\delta = \sqrt{\frac{1}{\pi \cdot f \cdot \mu \cdot \sigma}} = 503 \cdot \sqrt{\frac{\rho}{f \cdot \mu_r}}

Determines the test frequency required for eddy currents to penetrate through tube wall thickness to resolve outer diameter (OD) defects.

Variables:
δ\delta=Standard depth of penetration (mm)
ff=Test frequency (Hz)
μ\mu=Magnetic permeability (H/m)
σ\sigma=Electrical conductivity (% IACS or S/m)
ρ\rho=Electrical resistivity (\mu \Omega \cdot \text{cm})

TEMA RCB U-Tube Bending Thinning Allowance

Code Formula
tmin=t0⋅(1+d04⋅R)−1t_{\text{min}} = t_0 \cdot \left(1 + \frac{d_0}{4 \cdot R}\right)^{-1}

Calculates the mandatory minimum pre-bent tube wall thickness required to ensure bends do not breach minimum pressure limits.

Variables:
tmint_{\text{min}}=Minimum post-bend outer wall thickness (mm)
t0t_0=Original unbent tube wall thickness (mm)
d0d_0=Nominal tube outer diameter (mm)
RR=Centerline bend radius (mm)

Probe & Wedge Selection Specs

  • Bobbin Differential (Air-Core)
  • RFT Dual-Driver Bobbin
  • IRIS Ultrasonic Turbine Head

Code Acceptance Criteria

ASME Sec VIII Div 1 / TEMA RCB: Wall loss exceeding 60% requires mechanical or explosive tapered plugging. Wall loss between 40% and 59% is recorded on tube inspection sheet for 2-year trending.

Apply This Technique in the Field

Rent Calibrated Hardware or Hire Certified Inspectors