Refinery Reactors, Distillation Columns & Pressure Vessels
Refinery Reactors, Distillation Columns & Pressure Vessels

ASME Sec VIII / API 510 Pressure Vessel Turnaround Scope

Internal Visual, Automated PAUT Corrosion Mapping & Nozzle Weld Verification

Primary NDT Techniques:PAUTTOFDVT

Targeted Damage Mechanisms

  • Hydrogen-Induced Cracking (HIC)
  • Wet H2S Stress Corrosion Cracking
  • High Temperature Hydrogen Attack (HTHA)
  • Internal Erosion-Corrosion

Key Inspection Challenges Resolved

  • Tight multi-trade turnaround window where scaffolding, internal cleaning, and NDT must coordinate flawlessly.
  • Critical nozzle-to-shell welds present compound saddle geometries requiring specialized phased array wedges.
  • Wet H2S and sour crude service require high-sensitivity detection of sub-surface micro-cracks.

Standard Field Inspection Workflow

1

Permit & Internal VT Screening

Verify zero-energy de-inventory and perform comprehensive internal direct and remote visual inspection (VT/RVI) of vessel trays, demister pads, and shell lining.

2

Automated PAUT Shell Corrosion Mapping

Deploy magnetic wheel scanner with multi-element phased array probe to map 100% of high-wear shell impingement zones and bottom liquid head.

3

Nozzle & Circumferential Weld Sizing

Execute TOFD/PAUT scans on longitudinal and circumferential Category A & B welds and nozzle attachment welds per ASME Sec VIII UW-51.

4

Wet H2S Fluorescent MT (WFMT)

Perform AC yoke wet fluorescent magnetic particle inspection on internal cladding and nozzle heat-affected zones (HAZ) to detect hydrogen blistering or sulfide stress cracking.

Recommended Hardware & Probes

  • Olympus OmniScan X3 64-Channel PAUT Unit
  • MagMan Magnetic Wheel Scanner
  • Parker B100 AC Yoke

Governing Inspection Standards

  • API 510 Pressure Vessel Inspection Code
  • ASME BPVC Sec VIII Div 1 & 2
  • NACE MR0175 / ISO 15156 Sour Service

Turnaround Operations & Site Prep

Typical Outage Duration:3–6 Turnaround Shifts
Recommended Crew Roster:1× API 510 Certified Inspector, 2× PAUT/TOFD Level II Technicians, 1× MT/PT Technician
Pre-Requisite Site Prep & Safety:
  • Internal surfaces chemical washed and free of pyrophoric scale
  • Confined space entry permit and continuous ventilation active
  • Internal lighting and 110V ground-fault power delivered inside vessel

Certified Deliverables & Sign-Offs

  • Full Shell 0° PAUT Corrosion C-Scan Thickness Matrix
  • TOFD/PAUT Flaw Characterization & Fracture Mechanics Table
  • Internal Visual & Tray Hardware Inspection Logbook
  • API 510 Certified MAWP Re-Rating and Inspection Interval Document