Turnkey Inspection Projects Showcase

5-Tier Operational Lifecycle Architecture

Explore verified turnkey project case studies demonstrating asset hierarchies, 3D digital twins, ray tracing scan plans, and signed Level III inspection reports.

Turnkey Project Completed & CertifiedDOC #CRUDE-WELD-PWHT-PAUT-2026

Crude Unit Spool Weld Repair, PWHT & Post-PWHT PAUT

End-to-end 4-stage sequential turnaround scope combining defect excavation, ASME Sec IX TIG/SMAW spool repair, 2-hour Post-Weld Heat Treatment (PWHT), and final Level III / AWS CWI acceptance.

Turnkey Fixed Budget$54,000 Turnkey Multi-Trade Scope
Target Asset

14-inch Chrome-Moly (P11) Transfer Line Spool #CL-402

Asset Class

Process Piping Weld & Thermal Stress Relief

Client Sector

Downstream Oil & Gas Refinery

Governing Code

ASME Sec VIII Div 1 / ASME B31.3 / AWS D1.1

Hardware Fleet

Evident OmniScan X3 64:128PR + 6-Zone Ceramic Pad PWHT Console + AWS CWI Kit

Execution & QA

6 Days Turnaround Window

01

Initiation

Completed

02

Bidding

Completed

03

Execution

Completed

04

Completion

Completed

Project Scope Explorer5-Tier Hierarchy (Asset ➔ Method ➔ CAD ➔ Inspection ➔ Report)
Crude Unit Spool Weld Repair, PWHT & Post-PWHT PAUT
DOC-CRUDE-WELD-PWHT-PAUT
14-inch Chrome-Moly (P11) Transfer Line Spool #CL-402
4 Methods
CRUDE-WELD-PWHT-PAUT_3D_ScanPlan.cad
3D CAD
Pre-Repair PAUT
PAUT
CAL-01_PAUT_Setup.log
CAL
ASME IX Weld Repair
ASME
CAL-02_ASME_Setup.log
CAL
INSP-02_Girth_Weld_GW-14__Post-PWHT_Final_.log
WLD-02
PWHT Soak (690°C)
PWHT
CAL-03_PWHT_Setup.log
CAL
INSP-03_Girth_Weld_GW-14__Root_Pass_.log
WLD-01
Post-PWHT PAUT & Hardness
PAUT
CAL-04_PAUT_Setup.log
CAL
INSP-04_Girth_Weld_GW-14__Post-PWHT_Final_.log
WLD-02
RPT-CRUDE-WELD-PWHT-PAUT-2026_Signed.pdf
SHA-256
Path:
ASSETCompleted

14-inch Chrome-Moly (P11) Transfer Line Spool #CL-402

Process Piping Weld & Thermal Stress Relief • ASME Sec VIII Div 1 / ASME B31.3 / AWS D1.1 • Downstream Oil & Gas Refinery

Engineering Specifications & Parameters
Physical Asset14-inch Chrome-Moly (P11) Transfer Line Spool #CL-402
Asset CategoryProcess Piping Weld & Thermal Stress Relief
Governing CodeASME Sec VIII Div 1 / ASME B31.3 / AWS D1.1
Client FacilityDownstream Oil & Gas Refinery
Turnkey RFP Budget$54,000 Turnkey Multi-Trade Scope
Outage Window6 Days Turnaround Window
Connected CAD Studios & Deliverables
Contained Items (6)Click to inspect
1 Assets• 4 Methods• 1 CAD / Plans• 8 Inspections• 2 Certified Reports