Turnkey Inspection Projects Showcase

5-Tier Operational Lifecycle Architecture

Explore verified turnkey project case studies demonstrating asset hierarchies, 3D digital twins, ray tracing scan plans, and signed Level III inspection reports.

5-TIER OPERATIONAL LIFECYCLE DEMONSTRATION

Turnkey B2B Inspection Scopes: From CAD Model to Signed Report

Asset Owners post turnkey inspection scopes with 0% platform fees and optional Confidential Blind RFP privacy. Verified service providers mobilize certified hardware fleets, execute ray-traced scan plans in interactive 3D studios, and deliver cryptographically sealed reports.

1

Post Scope with Blind RFP

Asset owner outlines code compliance (API/ASME) & equipment matrix with masked confidential identity.

2

Level III Bidding & CAD Plan

Verified agencies submit sealed fixed-bid proposals and configure ray-traced ultrasonic scan plans.

3

Signed Level III Deliverable

Inspection results, defect heatmaps, and SHA-256 sealed reports delivered directly to the client.

Looking for Live, Active Turnkey Scopes?VERIFIED PROVIDERS ONLY

Upcoming plant shutdown RFPs and refinery maintenance scopes are securely gated to protect owner infrastructure privacy.

Browse Live RFPs Console

Exemplary Completed Inspection Scopes

Review representative deliverables demonstrating how our 3D CAD studios, ray tracing, and report engines interconnect.

3 Completed Scopes Available
API 650$38,500 Fixed RFP

Terminal Crude Tank Turnaround & Floor MFL Scan

Atmospheric Crude Storage Tank TK-104

Complete internal out-of-service inspection covering 2,290 m² tank bottom plate matrix, chime weld PAUT, and 5-course shell ultrasonic thickness profile.

Techniques & Hardware
MFL Floor MappingPAUT Annular RingVacuum Box Weld TestingUltrasonic Shell Crawling
3D Digital Twin CAD StudioAPI 650/653 Tank Designer
Launch 3D
Verified Inspection Readings (3)
Floor Plate B-04: Soil-Side Pitting CorrosionFlagged
Annular Ring Weld W-12: Root Lack of FusionCleared
Full Report
ASME Sec VIII Div 1$24,000 Fixed RFP

FCCU Overhead Condenser Tube Bundle Inspection

Exchanger Bundle E-201 (1,240 Tubes, Titanium Gr 2)

100% full bundle screening (1,240 tubes) identifying OD baffle wear, ammonia-induced wall thinning, and tube-to-tubesheet seal integrity.

Techniques & Hardware
Eddy Current (ECT)Internal Rotary IRISRemote Visual (RVI)Magnetic Saturation (MFL)
3D Digital Twin CAD StudioTEMA Tubesheet Designer
Launch 3D
Verified Inspection Readings (3)
Tube Row 08, Col 14: OD Baffle Plate Fretting WearFlagged
Tube Row 12, Col 09: Pinhole Through-Wall DefectReject
Full Report
API 570$31,500 Fixed RFP

Vacuum Gas Oil (VGO) Process Piping Loop CUI Survey

12" Schedule 80 ASTM A106 Gr B Piping Spool (Loop VGO-301)

Non-invasive on-stream screening for Corrosion Under Insulation (CUI) without removing weather jacketing, followed by focused high-temp PAUT wall sizing.

Techniques & Hardware
Pulsed Eddy Current (PEC)Phased Array UT (PAUT)Digital Radiography (CR/DR)API 570 CML Tracking
3D Digital Twin CAD StudioASME B31.3 Piping Isometric CAD
Launch 3D
Verified Inspection Readings (3)
Elbow E-02 Extrados: Flow-Accelerated CorrosionCleared
CML-04 Support Saddle: CUI Water Ingress ThinningFlagged
Full Report