Turnkey Inspection Projects Showcase

5-Tier Operational Lifecycle Architecture

Explore verified turnkey project case studies demonstrating asset hierarchies, 3D digital twins, ray tracing scan plans, and signed Level III inspection reports.

INTERACTIVE SANDBOX SHOWCASE

Interactive Sample Projects & Multi-Trade Deliverables

Inspect 10 complete sample scopes with 3D CAD links, defect logs, weld repair + PWHT flows, and Level III / CWI / AMPP digital sign-offs.

1

Post Scope / Blind RFP

API/ASME scope with optional NDA masking

2

Verified Bidding & CAD Plan

Sealed fixed-bid proposals & scan plans

3

Signed QA Deliverable

Level III / CWI / AMPP sealed reports

API 650$38,500 Fixed RFP

Terminal Crude Tank Turnaround & Floor MFL Scan

Atmospheric Crude Storage Tank TK-104

Complete internal out-of-service inspection covering 2,290 m² tank bottom plate matrix, chime weld PAUT, and 5-course shell ultrasonic thickness profile.

Techniques & Hardware
MFL Floor MappingPAUT Annular RingVacuum Box Weld TestingUltrasonic Shell Crawling
3D Vector CAD StudioAPI 650/653 Tank Designer
Launch 3D
Verified Inspection Readings (3)
Floor Plate B-04: Soil-Side Pitting CorrosionFlagged
Annular Ring Weld W-12: Root Lack of FusionCleared
Full Report
ASME Sec VIII Div 1$24,000 Fixed RFP

FCCU Overhead Condenser Tube Bundle Inspection

Exchanger Bundle E-201 (1,240 Tubes, Titanium Gr 2)

100% full bundle screening (1,240 tubes) identifying OD baffle wear, ammonia-induced wall thinning, and tube-to-tubesheet seal integrity.

Techniques & Hardware
Eddy Current (ECT)Internal Rotary IRISRemote Visual (RVI)Magnetic Saturation (MFL)
3D Vector CAD StudioTEMA Tubesheet Designer
Launch 3D
Verified Inspection Readings (3)
Tube Row 08, Col 14: OD Baffle Plate Fretting WearFlagged
Tube Row 12, Col 09: Pinhole Through-Wall DefectReject
Full Report
API 570$31,500 Fixed RFP

Vacuum Gas Oil (VGO) Process Piping Loop CUI Survey

12" Schedule 80 ASTM A106 Gr B Piping Spool (Loop VGO-301)

Non-invasive on-stream screening for Corrosion Under Insulation (CUI) without removing weather jacketing, followed by focused high-temp PAUT wall sizing.

Techniques & Hardware
Pulsed Eddy Current (PEC)Phased Array UT (PAUT)Digital Radiography (CR/DR)API 570 CML Tracking
3D Vector CAD StudioASME B31.3 Piping Isometric CAD
Launch 3D
Verified Inspection Readings (3)
Elbow E-02 Extrados: Flow-Accelerated Corrosion (FAC)Cleared
CML-04 Support Saddle: CUI (Corrosion Under Insulation)Flagged
Full Report
ASME Sec V Art 4$18,500 Fixed RFP

Heavy-Wall Reactor Weld PAUT & TOFD Ray Tracing Protocol

Hydrocracking Reactor Shell Girth Weld (W-04)

Acoustic ray tracing simulation, dual-sided 64-element sectoral sweep (40°–70°), and TOFD beam intersection modeling to ensure 100% volumetric weld root and bevel coverage.

Techniques & Hardware
Phased Array UT (PAUT)Time of Flight Diffraction (TOFD)Acoustic Ray Tracing
3D Vector CAD StudioPAUT / TOFD Scan Plan Designer
Launch 3D
Verified Inspection Readings (3)
Weld W-04 Root Pass (T: 118mm): Lack of Sidewall Fusion (LOSW)Reject
Weld W-04 Fill Pass 6 (T: 72mm): Interpass Slag Inclusion ClusterFlagged
Full Report
API 510$46,000 Fixed RFP

Desulfurization Hydrotreater Reactor Vessel Inspection

Hydrotreater Pressure Vessel V-101 (2:1 Ellipsoidal Head)

Comprehensive internal & external baseline inspection of thick-wall hydrotreater vessel evaluating 2:1 ellipsoidal head MAWP, nozzle reinforcement zones, and hydrogen damage micro-fissuring.

Techniques & Hardware
PAUT Flange Face & NozzleTOFD Shell Girth WeldsHigh-Temp HTHA BackscatterInternal Cladding Profiling
3D Vector CAD StudioASME Sec VIII / API 510 Vessel Designer
Launch 3D
Verified Inspection Readings (3)
Shell Course #3 HAZ (T: 142mm): High-Temperature Hydrogen Attack (HTHA)Reject
Stainless Cladding Interlayer (Head #1): Localized Clad Debonding / BlisterFlagged
Full Report
DNVGL-ST-0376$29,000 Fixed RFP

Offshore Wind Turbine Composite Blade & Tower RVI Survey

78-Meter Carbon/Glass Hybrid Rotor Blade #WTG-04

Non-contact aerial and confined internal inspection of 78-meter composite rotor blade, identifying internal spar cap wrinkles, lightning strike damage, and trailing edge bonding voids.

Techniques & Hardware
Drone LiDAR PhotogrammetryHigh-Res Optical RVIActive Pulsed ThermographyConfined Space Internal Drone
3D Vector CAD StudioDrone RVI & 3D Inspection Studio
Launch 3D
Verified Inspection Readings (3)
Spar Cap Station 42m (Internal): Carbon Fiber Wrinkle / DelaminationReject
Trailing Edge Station 68m (Tip): Lightning Receptor Pinhole ErosionFlagged
Full Report
ASME Sec V Art 4$12,500 Fixed Scope

Corrosion Mapping Acoustic Wedge Delay & TCG Calibration

Automated Crawler Dual-Wedge Setup for API 570 Line

Multi-angle acoustic focal law synthesis, element velocity calibration, and automated crawler encoder resolution verification for high-speed corrosion thickness mapping.

Techniques & Hardware
PAUT Linear E-ScanAcoustic Wedge Delay ProfilingTCG / DAC Curve GenerationEncoder Resolution Benchmark
3D Vector CAD StudioNDT Setup & Focal Law Builder
Launch 3D
Verified Inspection Readings (3)
Wedge Face Element 1-4 Contact: Wedge Curvature Mismatch (Air Gap)Reject
Calibration Block Hole #3 (T: 25mm): Side Drilled Hole (SDH) Sensitivity DropFlagged
Full Report
ASME Sec VIII Div 1$54,000 Turnkey Multi-Trade Scope

Crude Unit Spool Weld Repair, PWHT & Post-PWHT PAUT

14-inch Chrome-Moly (P11) Transfer Line Spool #CL-402

End-to-end 4-stage sequential turnaround scope combining defect excavation, ASME Sec IX TIG/SMAW spool repair, 2-hour Post-Weld Heat Treatment (PWHT), and final Level III / AWS CWI acceptance.

Techniques & Hardware
Pre-Repair PAUTASME IX Weld RepairPWHT Soak (690°C)Post-PWHT PAUT & Hardness
3D Vector CAD StudioPAUT Weld Scan Planner
Launch 3D
Verified Inspection Readings (2)
Girth Weld GW-14 (Root Pass): Lack of Root Fusion (Pre-Repair)Reject
Girth Weld GW-14 (Post-PWHT Final): Post-Repair Verification Scan (Cycle 1)Cleared
Full Report
IRATA ICOP$72,000 Turnkey Rope Access & Coating Scope

Offshore Flare Boom IRATA Rope Access & NACE Coating Refurbishment

North Sea Platform Flare Boom Structural Chord #FB-09

Zero-scaffolding offshore structural integrity campaign executed via IRATA Level 3 rope access crews performing corrosion mapping, Sa 2.5 abrasive blasting, and AMPP/NACE verified marine coating restoration.

Techniques & Hardware
IRATA Rope AccessAbrasive Blast (Sa 2.5)3-Coat Marine EpoxyAMPP / NACE DFT & Holiday Test
3D Vector CAD Studio3D Structure Defect Locator
Launch 3D
Verified Inspection Readings (2)
Lower Boom Chord Bay 4: Coating Blistering & Under-Film CorrosionReject
Lower Boom Chord Bay 4 (Post-Coating): Final Dry Film Thickness (SSPC-PA 2)Cleared
Full Report
ASME Sec V Art 6 & 7$28,500 Fixed Scope

Nuclear-Grade Heat Exchanger MT/PT & Ultrasonic Consumables Audit

Austenitic Stainless Steel Feedwater Heater #FWH-3B

High-purity austenitic stainless steel nozzle and tubesheet inspection enforcing strict halogen/sulfur-free (<50 ppm) consumable lot traceability and NIST-traceable calibration block verification.

Techniques & Hardware
Liquid Penetrant (PT)Ultrasonic Testing (UT)Batch Cert TraceabilityLevel III Audit
3D Vector CAD StudioTEMA Tubesheet CAD Studio
Launch 3D
Verified Inspection Readings (2)
Inlet Nozzle N1 Fillet Weld: Linear Surface Indication (Crater Crack)Reject
Outlet Nozzle N2 Fillet Weld: Post-Blend Fluorescent PT CheckCleared
Full Report