Turnkey Inspection Projects Showcase
5-Tier Operational Lifecycle ArchitectureExplore verified turnkey project case studies demonstrating asset hierarchies, 3D digital twins, ray tracing scan plans, and signed Level III inspection reports.
Turnkey Project Completed & CertifiedDOC #EXCHANGER-TEMA-2026
FCCU Overhead Condenser Tube Bundle Inspection
100% full bundle screening (1,240 tubes) identifying OD baffle wear, ammonia-induced wall thinning, and tube-to-tubesheet seal integrity.
Turnkey Fixed Budget$24,000 Fixed RFP
Target Asset
Exchanger Bundle E-201 (1,240 Tubes, Titanium Gr 2)
Asset Class
Shell & Tube Heat Exchanger Bundle (3/4" OD × 18 BWG)
Client Sector
Petrochemical Hydrocracker Unit
Governing Code
ASME Sec VIII Div 1 / TEMA RCB
Hardware Fleet
Eddyfi Ectane 2 Multi-Technology + IRIS Rotary Ultrasonic Probe
Execution & QA
4 Days Emergency Shutdown
01
Initiation
Completed
02
Bidding
Completed
03
Execution
Completed
04
Completion
Completed
Project Scope Explorer5-Tier Hierarchy (Asset ➔ Method ➔ CAD ➔ Inspection ➔ Report)
FCCU Overhead Condenser Tube Bundle Inspection
DOC-EXCHANGER-TEMAExchanger Bundle E-201 (1,240 Tubes, Titanium Gr 2)
4 Methods
EXCHANGER-TEMA_3D_ScanPlan.cad
3D CAD
Eddy Current (ECT)
ET
CAL-01_ET_Setup.log
CAL
INSP-01_Tube_Row_08__Col_14.log
IND-01
Internal Rotary IRIS
IRIS
CAL-02_IRIS_Setup.log
CAL
INSP-02_Tube_Row_12__Col_09.log
IND-02
Remote Visual (RVI)
RVI
CAL-03_RVI_Setup.log
CAL
INSP-03_Tubesheet_Joint_J-03.log
IND-03
Magnetic Saturation (MFL)
MFL
CAL-04_MFL_Setup.log
CAL
INSP-04_Tube_Row_08__Col_14.log
IND-04
RPT-EXCHANGER-TEMA-2026_Signed.pdf
SHA-256
Path:
ASSETCompleted
Exchanger Bundle E-201 (1,240 Tubes, Titanium Gr 2)
Shell & Tube Heat Exchanger Bundle (3/4" OD × 18 BWG) • ASME Sec VIII Div 1 / TEMA RCB • Petrochemical Hydrocracker Unit
Engineering Specifications & Parameters
Physical AssetExchanger Bundle E-201 (1,240 Tubes, Titanium Gr 2)
Asset CategoryShell & Tube Heat Exchanger Bundle (3/4" OD × 18 BWG)
Governing CodeASME Sec VIII Div 1 / TEMA RCB
Client FacilityPetrochemical Hydrocracker Unit
Turnkey RFP Budget$24,000 Fixed RFP
Outage Window4 Days Emergency Shutdown
Connected CAD Studios & Deliverables
Contained Items (6)Click to inspect
1 Assets• 4 Methods• 1 CAD / Plans• 8 Inspections• 2 Certified Reports