Turnkey Inspection Projects Showcase

5-Tier Operational Lifecycle Architecture

Explore verified turnkey project case studies demonstrating asset hierarchies, 3D digital twins, ray tracing scan plans, and signed Level III inspection reports.

Turnkey Project Completed & CertifiedDOC #FLARE-ROPE-ACCESS-COATING-2026

Offshore Flare Boom IRATA Rope Access & NACE Coating Refurbishment

Zero-scaffolding offshore structural integrity campaign executed via IRATA Level 3 rope access crews performing corrosion mapping, Sa 2.5 abrasive blasting, and AMPP/NACE verified marine coating restoration.

Turnkey Fixed Budget$72,000 Turnkey Rope Access & Coating Scope
Target Asset

North Sea Platform Flare Boom Structural Chord #FB-09

Asset Class

Offshore Structural Steel & Protective Coating

Client Sector

Offshore Upstream Oil & Gas

Governing Code

IRATA ICOP / AMPP (NACE) SP0188 / SSPC-PA 2

Hardware Fleet

IRATA Level 3 Twin-Rope Rigging + Elcometer 456 DFT Gauge + High-Voltage Holiday Detector

Execution & QA

10 Days Offshore Campaign

01

Initiation

Completed

02

Bidding

Completed

03

Execution

Completed

04

Completion

Completed

Project Scope Explorer5-Tier Hierarchy (Asset ➔ Method ➔ CAD ➔ Inspection ➔ Report)
Offshore Flare Boom IRATA Rope Access & NACE Coating Refurbishment
DOC-FLARE-ROPE-ACCESS-COATING
North Sea Platform Flare Boom Structural Chord #FB-09
4 Methods
FLARE-ROPE-ACCESS-COATING_3D_ScanPlan.cad
3D CAD
IRATA Rope Access
IRATA
CAL-01_IRATA_Setup.log
CAL
Abrasive Blast (Sa 2.5)
ABRASIVE
CAL-02_ABRASIVE_Setup.log
CAL
INSP-02_Lower_Boom_Chord_Bay_4__Post-Coating_.log
CTG-02
3-Coat Marine Epoxy
3
CAL-03_3_Setup.log
CAL
INSP-03_Lower_Boom_Chord_Bay_4.log
CTG-01
AMPP / NACE DFT & Holiday Test
AMPP
CAL-04_AMPP_Setup.log
CAL
INSP-04_Lower_Boom_Chord_Bay_4__Post-Coating_.log
CTG-02
RPT-FLARE-ROPE-ACCESS-COATING-2026_Signed.pdf
SHA-256
Path:
ASSETCompleted

North Sea Platform Flare Boom Structural Chord #FB-09

Offshore Structural Steel & Protective Coating • IRATA ICOP / AMPP (NACE) SP0188 / SSPC-PA 2 • Offshore Upstream Oil & Gas

Engineering Specifications & Parameters
Physical AssetNorth Sea Platform Flare Boom Structural Chord #FB-09
Asset CategoryOffshore Structural Steel & Protective Coating
Governing CodeIRATA ICOP / AMPP (NACE) SP0188 / SSPC-PA 2
Client FacilityOffshore Upstream Oil & Gas
Turnkey RFP Budget$72,000 Turnkey Rope Access & Coating Scope
Outage Window10 Days Offshore Campaign
Connected CAD Studios & Deliverables
Contained Items (6)Click to inspect
1 Assets• 4 Methods• 1 CAD / Plans• 8 Inspections• 2 Certified Reports