Turnkey Inspection Projects Showcase

5-Tier Operational Lifecycle Architecture

Explore verified turnkey project case studies demonstrating asset hierarchies, 3D digital twins, ray tracing scan plans, and signed Level III inspection reports.

Turnkey Project Completed & CertifiedDOC #SCAN-PLAN-PAUT-2026

Heavy-Wall Reactor Weld PAUT & TOFD Ray Tracing Protocol

Acoustic ray tracing simulation, dual-sided 64-element sectoral sweep (40°–70°), and TOFD beam intersection modeling to ensure 100% volumetric weld root and bevel coverage.

Turnkey Fixed Budget$18,500 Fixed RFP
Target Asset

Hydrocracking Reactor Shell Girth Weld (W-04)

Asset Class

Thick-Wall SA-387 Gr 22 Alloy Steel Weldment (125mm Wall)

Client Sector

Petrochemical Refining Complex

Governing Code

ASME Sec V Art 4 / ASME Sec VIII Div 2

Hardware Fleet

Evident OmniScan X3 64:128PR + Cobra Scanner + Dual TOFD Wedges

Execution & QA

3 Days Acquisition Window

01

Initiation

Completed

02

Bidding

Completed

03

Execution

Completed

04

Completion

Completed

Project Scope Explorer5-Tier Hierarchy (Asset ➔ Method ➔ CAD ➔ Inspection ➔ Report)
Heavy-Wall Reactor Weld PAUT & TOFD Ray Tracing Protocol
DOC-SCAN-PLAN-PAUT
Hydrocracking Reactor Shell Girth Weld (W-04)
3 Methods
SCAN-PLAN-PAUT_3D_ScanPlan.cad
3D CAD
Phased Array UT (PAUT)
PAUT
CAL-01_PAUT_Setup.log
CAL
Time of Flight Diffraction (TOFD)
TOFD
CAL-02_TOFD_Setup.log
CAL
INSP-02_Weld_W-04_Fill_Pass_6__T__72mm_.log
FLW-02
Acoustic Ray Tracing
ACOUSTIC
CAL-03_ACOUSTIC_Setup.log
CAL
INSP-03_Cap_Weld_Crown_HAZ.log
FLW-03
RPT-SCAN-PLAN-PAUT-2026_Signed.pdf
SHA-256
Path:
ASSETCompleted

Hydrocracking Reactor Shell Girth Weld (W-04)

Thick-Wall SA-387 Gr 22 Alloy Steel Weldment (125mm Wall) • ASME Sec V Art 4 / ASME Sec VIII Div 2 • Petrochemical Refining Complex

Engineering Specifications & Parameters
Physical AssetHydrocracking Reactor Shell Girth Weld (W-04)
Asset CategoryThick-Wall SA-387 Gr 22 Alloy Steel Weldment (125mm Wall)
Governing CodeASME Sec V Art 4 / ASME Sec VIII Div 2
Client FacilityPetrochemical Refining Complex
Turnkey RFP Budget$18,500 Fixed RFP
Outage Window3 Days Acquisition Window
Connected CAD Studios & Deliverables
Contained Items (5)Click to inspect
1 Assets• 3 Methods• 1 CAD / Plans• 6 Inspections• 2 Certified Reports