Turnkey Inspection Projects Showcase

5-Tier Operational Lifecycle Architecture

Explore verified turnkey project case studies demonstrating asset hierarchies, 3D digital twins, ray tracing scan plans, and signed Level III inspection reports.

Turnkey Project Completed & CertifiedDOC #TANK-API-653-2026

Terminal Crude Tank Turnaround & Floor MFL Scan

Complete internal out-of-service inspection covering 2,290 m² tank bottom plate matrix, chime weld PAUT, and 5-course shell ultrasonic thickness profile.

Turnkey Fixed Budget$38,500 Fixed RFP
Target Asset

Atmospheric Crude Storage Tank TK-104

Asset Class

Aboveground Storage Tank (54m Dia × 18m Height)

Client Sector

Gulf Coast Refining Terminal

Governing Code

API 650 / API 653 / ASME Sec V

Hardware Fleet

Silverwing Floorscan MFL 3Di + Olympus OmniScan X3 PAUT

Execution & QA

7 Days Turnaround Outage

01

Initiation

Completed

02

Bidding

Completed

03

Execution

Completed

04

Completion

Completed

Project Scope Explorer5-Tier Hierarchy (Asset ➔ Method ➔ CAD ➔ Inspection ➔ Report)
Terminal Crude Tank Turnaround & Floor MFL Scan
DOC-TANK-API-653
Atmospheric Crude Storage Tank TK-104
4 Methods
TANK-API-653_3D_ScanPlan.cad
3D CAD
MFL Floor Mapping
MFL
CAL-01_MFL_Setup.log
CAL
PAUT Annular Ring
PAUT
CAL-02_PAUT_Setup.log
CAL
INSP-02_Annular_Ring_Weld_W-12.log
IND-02
Vacuum Box Weld Testing
VACUUM
CAL-03_VACUUM_Setup.log
CAL
INSP-03_Shell_Course__2_Plate_07.log
IND-03
Ultrasonic Shell Crawling
ULTRASONIC
CAL-04_ULTRASONIC_Setup.log
CAL
INSP-04_Floor_Plate_B-04.log
IND-04
RPT-TANK-API-653-2026_Signed.pdf
SHA-256
Path:
ASSETCompleted

Atmospheric Crude Storage Tank TK-104

Aboveground Storage Tank (54m Dia × 18m Height) • API 650 / API 653 / ASME Sec V • Gulf Coast Refining Terminal

Engineering Specifications & Parameters
Physical AssetAtmospheric Crude Storage Tank TK-104
Asset CategoryAboveground Storage Tank (54m Dia × 18m Height)
Governing CodeAPI 650 / API 653 / ASME Sec V
Client FacilityGulf Coast Refining Terminal
Turnkey RFP Budget$38,500 Fixed RFP
Outage Window7 Days Turnaround Outage
Connected CAD Studios & Deliverables
Contained Items (6)Click to inspect
1 Assets• 4 Methods• 1 CAD / Plans• 8 Inspections• 2 Certified Reports