Turnkey Inspection Projects Showcase
5-Tier Operational Lifecycle ArchitectureExplore verified turnkey project case studies demonstrating asset hierarchies, 3D digital twins, ray tracing scan plans, and signed Level III inspection reports.
CERTIFIED DELIVERABLE REPORTCompleted & SignedDOC #TANK-API-653-2026
Terminal Crude Tank Turnaround & Floor MFL Scan
Initiation
Bidding
Execution
Completion
Completed
Next Step for Client
Project status monitoring active.
Turnkey Scope RFPFixed-Bid Scope ($38,500 Fixed RFP)7 Days Turnaround Outage
Project Specification & Asset Overview
Code Specs & Regulatory Standards ISO 17025 Calibrated
API 650 / API 653 / ASME Sec VASME Sec VLevel III Approval Required
Project Description
Complete internal out-of-service inspection covering 2,290 m² tank bottom plate matrix, chime weld PAUT, and 5-course shell ultrasonic thickness profile.
Target Asset
Atmospheric Crude Storage Tank TK-104
Asset Category
Aboveground Storage Tank (54m Dia × 18m Height)
Client Industry
Gulf Coast Refining Terminal
Turnkey Fixed Budget
$38,500 Fixed RFP
Mobilized Inspection Fleet & Calibrated Hardware
Silverwing Floorscan MFL 3Di + Olympus OmniScan X3 PAUT
5-Tier Work Breakdown Structure
Interactive operational tree: Project → Asset → NDT Techniques → Inspection Logs.
Atmospheric Crude Storage Tank TK-104Aboveground Storage Tank (54m Dia × 18m Height) • API 650 / API 653 / ASME Sec V
Completed
MFL Floor MappingGoverning Spec: API 650 / API 653 / ASME Sec V • 100% Calibrated
Completed
PAUT Annular RingGoverning Spec: API 650 / API 653 / ASME Sec V • 100% Calibrated
Completed
Vacuum Box Weld TestingGoverning Spec: API 650 / API 653 / ASME Sec V • 100% Calibrated
Completed
Ultrasonic Shell CrawlingGoverning Spec: API 650 / API 653 / ASME Sec V • 100% Calibrated
Completed