Turnkey Inspection Projects Showcase

5-Tier Operational Lifecycle Architecture

Explore verified turnkey project case studies demonstrating asset hierarchies, 3D digital twins, ray tracing scan plans, and signed Level III inspection reports.

CERTIFIED DELIVERABLE REPORTCompleted & SignedDOC #TANK-API-653-2026

Terminal Crude Tank Turnaround & Floor MFL Scan

Browse Live RFPs

Initiation

Bidding

Execution

Completion

Completed

Next Step for Client

Project status monitoring active.

Turnkey Scope RFPFixed-Bid Scope ($38,500 Fixed RFP)7 Days Turnaround Outage

Project Specification & Asset Overview

Launch API 650/653 Tank Designer
Code Specs & Regulatory Standards ISO 17025 Calibrated
API 650 / API 653 / ASME Sec VASME Sec VLevel III Approval Required

Project Description

Complete internal out-of-service inspection covering 2,290 m² tank bottom plate matrix, chime weld PAUT, and 5-course shell ultrasonic thickness profile.

Target Asset

Atmospheric Crude Storage Tank TK-104

Asset Category

Aboveground Storage Tank (54m Dia × 18m Height)

Client Industry

Gulf Coast Refining Terminal

Turnkey Fixed Budget

$38,500 Fixed RFP

Mobilized Inspection Fleet & Calibrated Hardware

Silverwing Floorscan MFL 3Di + Olympus OmniScan X3 PAUT

5-Tier Work Breakdown Structure

Interactive operational tree: Project → Asset → NDT Techniques → Inspection Logs.
Atmospheric Crude Storage Tank TK-104Aboveground Storage Tank (54m Dia × 18m Height) • API 650 / API 653 / ASME Sec V
Completed
MFL Floor MappingGoverning Spec: API 650 / API 653 / ASME Sec V • 100% Calibrated
Completed
PAUT Annular RingGoverning Spec: API 650 / API 653 / ASME Sec V • 100% Calibrated
Completed
Vacuum Box Weld TestingGoverning Spec: API 650 / API 653 / ASME Sec V • 100% Calibrated
Completed
Ultrasonic Shell CrawlingGoverning Spec: API 650 / API 653 / ASME Sec V • 100% Calibrated
Completed