Turnkey Inspection Projects Showcase

5-Tier Operational Lifecycle Architecture

Explore verified turnkey project case studies demonstrating asset hierarchies, 3D digital twins, ray tracing scan plans, and signed Level III inspection reports.

Turnkey Project Completed & CertifiedDOC #PIPING-API-570-2026

Vacuum Gas Oil (VGO) Process Piping Loop CUI Survey

Non-invasive on-stream screening for Corrosion Under Insulation (CUI) without removing weather jacketing, followed by focused high-temp PAUT wall sizing.

Turnkey Fixed Budget$31,500 Fixed RFP
Target Asset

12" Schedule 80 ASTM A106 Gr B Piping Spool (Loop VGO-301)

Asset Class

Insulated Hydrocarbon Process Piping Loop (280m Run)

Client Sector

Integrated Coastal Refinery

Governing Code

API 570 / ASME B31.3 / API 571

Hardware Fleet

Eddyfi Lyft Pulsed Eddy Current (PEC) + Olympus Epoch 6LT UT

Execution & QA

5 Days On-Stream Survey

01

Initiation

Completed

02

Bidding

Completed

03

Execution

Completed

04

Completion

Completed

Project Scope Explorer5-Tier Hierarchy (Asset ➔ Method ➔ CAD ➔ Inspection ➔ Report)
Vacuum Gas Oil (VGO) Process Piping Loop CUI Survey
DOC-PIPING-API-570
12" Schedule 80 ASTM A106 Gr B Piping Spool (Loop VGO-301)
4 Methods
PIPING-API-570_3D_ScanPlan.cad
3D CAD
Pulsed Eddy Current (PEC)
PEC
CAL-01_PEC_Setup.log
CAL
Phased Array UT (PAUT)
PAUT
CAL-02_PAUT_Setup.log
CAL
INSP-02_CML-04_Support_Saddle.log
DEF-02
Digital Radiography (CR/DR)
CR
CAL-03_CR_Setup.log
CAL
INSP-03_Nozzle_N-01_HAZ_Weld.log
DEF-03
API 570 CML Tracking
API
CAL-04_API_Setup.log
CAL
INSP-04_Elbow_E-02_Extrados.log
DEF-01
RPT-PIPING-API-570-2026_Signed.pdf
SHA-256
Path:
ASSETCompleted

12" Schedule 80 ASTM A106 Gr B Piping Spool (Loop VGO-301)

Insulated Hydrocarbon Process Piping Loop (280m Run) • API 570 / ASME B31.3 / API 571 • Integrated Coastal Refinery

Engineering Specifications & Parameters
Physical Asset12" Schedule 80 ASTM A106 Gr B Piping Spool (Loop VGO-301)
Asset CategoryInsulated Hydrocarbon Process Piping Loop (280m Run)
Governing CodeAPI 570 / ASME B31.3 / API 571
Client FacilityIntegrated Coastal Refinery
Turnkey RFP Budget$31,500 Fixed RFP
Outage Window5 Days On-Stream Survey
Connected CAD Studios & Deliverables
Contained Items (6)Click to inspect
1 Assets• 4 Methods• 1 CAD / Plans• 8 Inspections• 2 Certified Reports